Meter Pole Requirements

When a MTEMC pole is changed out, any meters on MTEMC's poles shall be removed if possible. Use our concrete calculator to determine the amount of concrete needed to pour your concrete slab. For this reason the 40 meter section was left a little long so that when the 80 meter section is the correct length, the 40 meter section resonates on the desired frequency. Select your town or city from the dropdown box below to view permit and inspection requirements for your town or city. For our 400A service, we were required to run a single 3" conduit from the green box at our property line to the meter panel on our cabin. Customer shall coordinate the installation with the Company. Where permits, inspections and registrations are required by law, the applicant must provide NEMEPA with the documents showing such has been applied for, accepted and inspected. Back-fill the remaining area with dirt and sod or other decorative material. We deliver power, maintain and read meters and construct and maintain. Whether you're adding an electric-vehicle charger or building your dream house or a sports arena, our Design & Construction Services team is here to help you connect to SMUD's electric system. Their use is intended to promote a safe, efficient manner for receiving electrical service. Regulators, meters, and other equipment. Height Requirements for Overhead Lines Take special note of overhead line clearances especially in farm yards and at approaches when moving equipment in and out of fields. 5 feet above the ground. 3 Refund of Residential Deposit 2. ft (so remember you need to at least double that for 2 goats!). 6 feet (20 meters) long, these vessels must exhibit the lights as shown in Figure 1. Poles are shipped by the hundreds and thousands, but each pole carries the individual mark of first-rate craftsmanship. NYSEG will specify the size of the meter pole and setting depth based on field conditions. This specific example includes a measure line distance that is not recommended for tracks surrounding soccer, field hockey or lacrosse fields. NRTL - Nationally Recognized Testing Laboratories. City of Austin Electric Utility. See drawing on the front of this sheet for an example of a typical meter pole. The meter comes preloaded with the most popular satellites but is also. "Meter" - a device for measuring the electric power and energy supplied to a customer. HOW TO CHANGE A METER SOCKET BOX Connecting to Power Poles JRC Homestead Texas 20,252 views. Entrance cable to Mobile Home 8' Min. If a consumer has any question concerning the current Service Rules and Regulations, inquiry should be directed to any of the Cooperative's offices. Their horizontal load-bearing capacity is 4,500 lbs. Good Afternoon Everyone, I have been getting a lot of questions about an email that came out recently from duke energy concerning new MEG meter cans and Wes was kind enough to get me this information that may help to explain. Class B was discontinued in 1985, changed to grade level play (7 and 8) and school size, our present classes. Meter Pole Meter Loop Specs. terminal is available for Company issued me ter sockets. 60: 01/22/2019: 0100. If you are working in metres, simply exchange the footcandle numbers for the appropriate lux numbers from the table and calculate your room area in square metres. Download the Electric & Gas Service Requirements 2017-2018 (PDF, 4. Sales and delivery are limited to locations inside Sumter EMC's service territory in Georgia. Energy’s requirements that are in addition to the National Electric Code (NEC). ATHLETICBUSINESS. A measurement of 1000kg will result. 1 Meter Pole. Fayette Electric Cooperative sponsored the PowerHouse ™ Energy Investigation Program for Fayetteville fifth grade science students. Touchstone Energy® Cooperatives is a national network of electric cooperatives across 46 states that provides resources and leverages partnerships to help member cooperatives and their employees better engage and serve their members. A 200 amp meter service is the most common type of electrical service found in residential homes. When grounding at the house, Licensees are not permitted to connect to PSO’s meter base. Electric Service and Meter Installation Requirements 5 l Meter bases are provided by the Customer/Contractor and shall be electrical grade, steel, UL listed and stickered, NEMA 3R, and have a maximum rating of 320 amps (residential)/200amps (commercial). Where damage to the meter box or meter box door puts the network equipment at risk or the public at danger, the damage may be repaired by the network operator. The Wire Size can range from 16 AWG to 12 AWG. Today, we are one of the largest manufacturers of quality meter mounting equipment in the United States,. Either an eyebolt or a J-hook is acceptable and must be within the top 6 inches of the pole (12 feet above ground). Long/200 kg psc pole and maintains good business relationship with gujarat electricity board (pgvcl-rajkot). 3 Access (a) BC Hydro shall have reasonable access to the metering equipment to permit its reading, testing and maintenance. Track Surveying ARTICLE 3. But if I am away when the sneeky snake people come they will still change it. 1/8 inch wide and 2 inch deep or 1/4 slab thickness if slab is greater than 8 inches thick. must be weatherproof type. 7 Pull Box: September 2011: 1-1 (2/2) Light Duty - Light Weight No. Added " When the space above the instrument transformer cabinet is intended as the location for the meter or meters, it is necessary that adequate space be reserved for this purpose. The attachment point from supply to service mast must be a minimum of 4. pole/arm-mounted area and roadway luminaires) as well as helpful calculations. 1-3 — Meter Pole (Single-phase Underground Load Connection) Installation Specifications. 01 Purpose Most customers wishing to establish new electric service with NorthWestern Energy will find that the information provided in NorthWestern Energy Company’s New Service Guide adequately describes the details and requirements for establishing a new electric service. transformer to the meter socket, and install the meter. Singlewide Mobile Homes a. 8: A 15-m intermediate pole under bending test with a displacement of 10 %. SERVICE DROPS (Cont. Touchstone Energy® Cooperatives is a national network of electric cooperatives across 46 states that provides resources and leverages partnerships to help member cooperatives and their employees better engage and serve their members. Stays, Guys and Struts. ATTACHMENT: The customer must provide point of attachment at the top of the pole. 2707 Underground Secondary Service on Company Owned Poles. proceeding with any wiring, information regarding service availability and meter location should be obtained from the company. American Pole & Timber supplies southern yellow pine treated poles and posts for projects anywhere in American -- and often beyond. 6-2-6: Clarifies that it is illegal to run backward or in the opposite direction (non-legal direction) on a horizontal jump, pole vault or javelin runway. Enter the desired frequency. 4-D, 58, 88 (See also Following headings) Cable Terminals Capacitors Disconnects Line Switches Metal Boxes Meters Street Lighting Time Switches Traffic Signals. Application for Service. Zoning district information is available on-line by clicking on E-Zoning. Meters will not be allowed above or below the natural gas service entrance equipment. No Member equipment is allowed on any WCEC owned pole. Electric meters read power usage in kilowatt hours. For clearance and location criteria, see Section 5. Requirements. It is very important that you understand this timeline: You should have begun arranging for both temporary and permanent power no later than the pre-construction meeting with True Built Home. Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube. Additional requirements may be required for your permanent meter service depending on your application, first contact KUA's Engineering Department before proceeding with any work. Requirements; PDF Misc. The third Underground Service drawing is intended for installation within three foot of a Cooperative transformer. Applying for temporary or new permanent meter installation. Communication between the smart meters and the CGRs is via radio frequency (RF). Meter bases must have a provision to accept an OUC lock or seal. Requirements for Service. Some manufacturers provide additional steel footings for their light poles. Be aware from the outset that all work must comply with the National Electric Code, your Governing authority's electrical inspection requirements, and with ComEd Service Standards. Electric Cooperative. ice loads, concrete poles are far better capable of bending in the direction of the loads without being damaged – unlike stayed poles or lattice towers. Meter pedestals - manufacturers and specifications. Where meters are installed indoors, they shall be located on the first floor or in the basement where they will be readily accessible to authorized company representatives for meter reading, testing, or. Meter bases must have a provision to accept an OUC lock or seal. and 4 pole Fall-of-Potential testing, selective testing, stakeless testing and 2 pole testing. Definitions 4 B. My Analogue Meter is on a telephone pole 5 feet from the house and the meter sits on a metal box, how am I stop them from changing it to a smack us meter. There are a total of six terminals inside the meter, three on the load (output) end, and the remaining three on the line (utility or input) end. Electric Service and/or Meter Relocation Complete this section only if your Vectren electric service and/or the associated meter needs to be relocated. Check with your Ameren Illinois representative for individual site requirements. guidance for those Customers whose service point is a customer owned primary meter pole. The City of Abbeville will provide the following equipment and materials: underground meter box, treated wood H-frame to mount meter box, 8 foot ground rod with clamp and grounding wire. Bluebonnet meter pole. Should I get foil ready?. GAS METER INSPECTION: Gas service to building must be installed by the gas company. APS issued two separate Requests for Proposals for solar and wind resources that will help expand our renewable energy portfolio to approximately 2,500 megawatts by 2021 – enough to power more than a half-million Arizona homes. Meter base is. From treated fence posts, to #1 treated posts, to solid structural columns, we can supply your treated posts and pole needs. We deliver power, maintain and read meters and construct and maintain. The member will furnish and set a meter pole. Welcome to INGAL EPS. When the eave overhang is less than eighteen inches, additional protection shall be required to protect the meter from snow and ice damage by a minimum of an 18 gauge galvanized metal hood or equivalent extending over the meter. CECC Service Specification Guide 180221. ) Note: These diagrams depict an example of a high school pole vault landing area. This certification shall be maintained and made available upon request. The J-Pole is an excellent antenna for working the local repeaters and 2m simplex voice and digital. Your bill is estimated - you'll be credited the portion of the fee that covers meter. Requirements. A nearby meter number can aid this process. Information and Recommendations. Two constructions are available. 1 TITLE These Administrative Regulations along with the requirements included in the 2011 Edition of the National Electrical Code (NFiPA-70 - 2011) as adopted by the North Carolina Building Code Council on June 14, 2011, to be effective. Also see: Requirements for Electric Service for Southwestern Electric Power Company. 0 Page: iv Revision Date: May 1, 2016 Effective Date: August 1, 2016 CPS Energy Pole Attachment Standards Table of Contents Section Page I. The City of Abbeville will provide the following equipment and materials: underground meter box, treated wood H-frame to mount meter box, 8 foot ground rod with clamp and grounding wire. This is typically a pole line on the property with individual services to each primary meter pole. 100 AMP Mobile Home Overhead Meter Pole Installation. No conversion factor or multiplier. Smooth single swimming pool ceramic message tile feature a single message in 4″ tall black characters on a white background. 00 additional outlets with receivers $45. duplex receptacles. 801-06 or CRL Document No. Meters will not be allowed above or below the natural gas service entrance equipment. Expansion coupling installed in fully closed position in the left meter base knockout Maximum of 3 - 24" minimum radius bends - only 1 - 24" minimum radius bend allowed in addition to the bends installed at the transformer, pedestal, pole, and/or meter base Conduit installed minimum 24" deep Service cables. with a minimum length of 23 feet and a minimum pole top diameter of 6 inches. Most new properties are built to include a meter box. • The driveway must not obstruct access or cause damage to public utilities such as bus stops, bikeways, parking bays, taxi ranks, stormwater drains, water meters, fire hydrants, utility service pits, street trees and power or light poles. Other applicable documents associated with permanent electric service are the “Underground Standard Requirements” and the “Facility Connection Requirements”. Pole Vault 800m Run 400m Hurdles (10-36” Boys) 1500m Run 2000m Steeplechase (30” Girls/36” Boys) 18 hurdle jumps 5 water jumps Javelin (800g) 400m Hurdles (10-30” Girls 4x100m Relay 4x400m Relay 4x800m Relay Stadium Guidelines/Requirements: Depending on the amount of athletes you expect for the meet you should be prepared to handle all. The energy we use doesn’t have to contribute to climate change. AEP West Approved Meter Socket List; Meter main/combinations - manufacturers and specifications. Requirements; PDF Change of Service & Meter Service Requirements; PDF Commercial Brochure; PDF Commercial Membrane Structures Brochure; PDF Demolition Requirements; PDF Detached Structure less than 400 sq. 46—For Roadway and Area Lighting Equipment—Concrete Lighting Poles Applies to concrete lighting poles used in roadway and area lighting equipment and includes nomenclature, performance criteria, marking and record keeping requirements and certain minimal material needs. While changes to the Code are gradual, it is always a good idea to check on the requirements of the latest edition of the NEC. Surface mounted meter installation. Inside Kingman or Lake Havasu City Limits: Certain city ordinances prohibit the Company from supplying electric service to a customer until a certificate of inspection and acceptance, or “green tag”, has been issued by the city inspector. The pole must be at least four feet in the ground. All information, images, and documents on this website are the sole property of MFJ Enterprises, Inc. Any unsafe wiring found will not be connected until it has been corrected by the customer. meter service poles in tvec service area tvec will spot all meter poles minimum clearance requirements 18' minimum clearance is required over public roadways eye bolt furnished by tvec 2" rigid or schedule 80 pvc conduit #6 solid copper for 100 amp service and within 24" of the eyebolt 12' minimum clearance is required over minimum 18" lenghths. This section of our website contains the manuals used by engineers, contractors, homeowners, developers and architects to ensure that standards and safety requirements are met in the. service entrance vii. It seems to me I should be able to run the line hook it up and then have it inspected by a qualified person ( saving me from having to pay for it) but what I need to know is what type of wire do I need to get and can I hook it to the box already there or do I need to. Description Reviewed/Checked Approved December 2018 8 Updated meter room requirements,. It is important that your new meter is installed in a safe, maintained, and easily accessible location. meter pole 200 amp service, 120/240 vac. Please see the following documents for information on customer-owned:. Meter Pole – Pressure treated wood pole with meter. By having the gas and electric meter located together, or being jointly installed, the installation costs may be reduced or eliminated. Metal Poles 52. 10 for meter pole specifications. CECC Service Specification Guide 180221. Receptacles shall be completely 2-20 amp single pole circuit breakers and 2-GFI 1. Electrical Panel Permit Requirements The on-line permit is available for properties in Sunnyvale with a residential zoning district. Pole Mount Brackets Showing 1–24 of 61 results Default sorting Sort by popularity Sort by average rating Sort by latest Sort by price: low to high Sort by price: high to low. 6 – Single-Phase Overhead Meter Pole Requirements Drawing No. SWIMMING POOL CLEARANCE FOR SUPPLY SERVICE DROPS (INCLUDES HOT TUBS) G. The following electric service guides are the Company requirements at the date of AEP Meter & Service Guide The overhead service conductors from the last pole. The information and recommendations in our Meter and Service Guide (PDF) are, in general, sufficient to. 0 overhead services 0 - 600 volts 400. 1/8 inch wide and 2 inch deep or 1/4 slab thickness if slab is greater than 8 inches thick. Free Shipping by Amazon. The 5000 meters is 12. The right clearance means our crews can climb, and work on and around, the poles to restore power, make repairs, or perform maintenance. Your Flag Pole is now ready to set. The Public Utilities Commission of Ohio (PUCO) affects every household in Ohio. This order, 165, Appendix A, establishes minimum requirements for electric distribution facilities regarding: Inspection (including maximum allowable inspection cycle length,) condition rating. Electrical code requirements for location of power meter panel. The amount of concrete you require will display in cubic metres in the blue box. IAAF STANDARD 400 METER TRACK 400 METER EVENTS Note: This diagram indicates just one example of a 400 meter event layout. Revised Paragraph: The meter socket neutral lug bonds the meter socket toAdded “ ”. 5 feet below ground level at an approved location by a Sam Houston Electric Cooperative inspector. REQUIREMENTS FOR COMMERCIAL MULTIPLE METER INSTALLATIONS 1. Variations of this design may be considered equal as long as NEC requirements are met. Scheduling and performance of corrective action. Conduit may be fastened directly to a customer owned pole but a climbing space must still be maintained. Sockets work with a circuit breaker distribution section in a rainproof enclosure for residential installations, rural service entrance, mobile homes, and for temporary power on construction sites. This list of approved meter bases for Pennyrile Electric installations will also be available at any Pennyrile office. A Power-Pole anchor also allows you precise bow control and allows you to fish in any wind direction. All boxes on an overhead temporary service pole will be considered exposed to wet location. Someone who is delaying the project, and taking too long, causing everyone else time, money and expense. Some manufacturers provide additional steel footings for their light poles. The location of the meter loop and meter pole must be in a location mutually acceptable to the member and the cooperative. Information and Recommendations. 5 feet above the ground. and 4 pole Fall-of-Potential testing, selective testing, stakeless testing and 2 pole testing. Underground Underground Service to Mobile Home Do’s and Don’ts for Underground Service to a Meter Pole. EEP - Electrical engineering portal is leading education provider in many fields of electrical engineering, specialized in high-, medium- and low voltage applications, power substations and energy generation, transmission and distribution. TNMP is an electric transmission and distribution company in Texas. Variations of this design may be considered equal as long as NEC requirements are met. metering viii. 1 – Meter Pole Installation - (Page 60). To provide a quality service (electricity, water, internet) at a reasonable price, bringing vital services to increase both the quality of life and economic health in the Mid- South Synergy service area. GAS METER INSPECTION: Gas service to building must be installed by the gas company. Use the measuring tape to measure a distance of 6 feet from the meter pole. We provide him always best services. Normally, there is no need for anyone. "ELECTRIC SERVICE REQUIREMENTS" BOOK - 2013 EDITION As we continue to work together to provide customers with the highest quality of electric service, El Paso Electric Company's (EPE) "Electric Service Requirements" book, commonly referred to as "The Blue Book," has been revised to keep up to date with the most current codes, standards and trends. A full suite of quick release top plates and adaptors for all types of antennas, cameras and devices that allow for fast and easy installation and increased flexability for warfighters who have to mount multiple devices on a single mast. 13 Resistance Grounded Services allow neutral loadan additional demand factoraligning with NEC. PLEASE NOTE: No external current transformers are needed with this meter. As standard, branch breakers shall be mounted at the top of the panel with “spaces” at the bottom, regardless of the direction panel is fed. Pole should be 6 inches in diameter. Frequently asked questions about the safety of radiofrequency (RF) and microwave emissions from transmitters and facilities regulated by the FCC For further information contact the FCC's RF Safety Program at [email protected] The conduit is to be attached directly to the pole. Established in 1946, TEC's Pole Manufacturing Plant is headquartered in Jasper County, deep in the East Texas Piney Woods. APS issued two separate Requests for Proposals for solar and wind resources that will help expand our renewable energy portfolio to approximately 2,500 megawatts by 2021 – enough to power more than a half-million Arizona homes. TESCO – The Eastern Specialty Company was founded in 1904 by a metering engineer at the Philadelphia Electric Company (PECO) who saw a need for safer products in the industry and designed the first meter test switch to promote safer field operations. pole(s) to verify that they meet the requirements stated within this note (Note 7). By Frederic P. √ Are there at least three straps holding the entrance cable or the conduit riser onto the structure or pole? √ If aluminum wire is used, has penatrox or oxyguard been applied to all termination points? √ Are all unused holes in meter base / disconnect closed?. The Cooperative Difference. Mobile homes must use a permanently installed meter pole located not more than 30 feet from the mobile home that it serves. Electric Load Requirements Gas Load Requirements Billing Information Site Plan A site Plan to scale Existing and proposed utilities Existing BGE poles and pole numbers, meters and/or pad mounted transformer locations Driveway, sidewalk, and property lines Street names and lot numbers Buildings/houses Fences. protection, sized Rigid/intermediate metal (steel), rigid aluminum, EMT, or Weatherproof main switch, fuse or circuit breaker Meter socket for overhead service. 2711 200 – 400 Amp Outdoor Underground Pedestal Metering. How to Build a Pole Barn. Clearance guidelines for facilities and easements. Pole must be installed within 75’ of pole top transformer or 1’ from a pad mount transformer. Instrument rated meters are allowed on MTEMC owned poles. The second drawing is for meter loop installations on a short pole, which would be appropriate for service to mobile homes, wells or similar installations. Extech offers one of the largest selections of light meter models for industrial and building audit usage. Water service and meter crossing through bioretention cell and rain garden: Provide minimum depth of cover per SPU water. The information and recommendations in our Meter and Service Guide (PDF) are, in general, sufficient to answer questions concerning a majority of electrical installations. Article 422. Click here to be redirected. Meter Pole Installation - Underground Service - Single Phase If you have additional questions, please send us an email below with your request or contact us today at 800-239-3092. An electric meter (or "watt/hour" meter) is a device your local electric utility uses to measure the amount of power used in a building or home, for billing purposes. Meter Enclosure - A metal cabinet which contains a socket for inserting a meter in order to measure consumption of electrical energy (also referred to as a meter box, meter can, or meter socket). See Section11. You may wish to confirm other requirements with your local safety authority. Note: The lighting calculation example below is calculated using the imperial system (feet). standard service characteristics iv. Providing essential footcandle and Lux readings, Extech’s digital light meter range includes affordable, general-use models as well as sophisticated datalogging, LED (white, red and blue), and UV light meter choices. Distribution switchboards, including the Main LV Switchboard (MLVS), are critical to the dependability of an electrical installation. All service entrance equipment from the meter box to the house is to be supplied and installed by the member, including proper size conduit from the meter base to 12” below ground level. 2 lbs), signal meter. Bluebonnet meter pole. Meter pole size where applicable, will be determined by a Cooperative Representative. cra-es reserves the right to determine all meter locations, including points of attachment, and only authorized cra-es personnel shall determine this location. Search all of the Frequently Asked Questions (FAQs) by TXU Energy consumers and read through our Featured FAQs today!. It is between 220 and 240 volts, whereas in Japan and in most of the Americas the voltage is between 100 and 127 volts. physical location of the pole will be approved by the co-op. or 6" Round Materials Required 100 AMP 4' 18" Min. PRE-INSPECTION: Once the City provides notification to the property owners that the District is ready for private overhead to underground utility conversion, please contact the responsible Building Inspector, Ed Hotz, at (949) 644-3273 for a pre-inspection. Electric Service and/or Meter Relocation Complete this section only if your Vectren electric service and/or the associated meter needs to be relocated. This edition of “Standard Drawings for Water and Wastewater Construction” is written by Engineering Services, Dallas Water Utilities. 100 AMP / 200 AMP Underground Service Installation (On House) 400 AMP (320) Underground Service Installation. Meter Cabinets and Enclosures 2. Either an eyebolt or a J-hook is acceptable and must be. Meter poles shall not have more than two meter loops. Purchase a permit, request an inspection or get an annual permit for your business. Receptacles shall be completely 2-20 amp single pole circuit breakers and 2-GFI 1. ) shall be allowed on DEMCO facilities. 4' 18" Min. All service entrance equipment from the meter box to the house is to be supplied and installed by the member, including proper size conduit from the meter base to 12” below ground level. Meter poles must also be buried at a minimum of 4. Three wire, three-phase systems are usually distributed only to industrial and large commercial areas. GENERAL INFORMATION FROM SERVICE CONVERSION FROM OVERHEAD TO UNDERGROUND 1. Standards may be adjusted to raise and lower the bar and also to adjust the horizontal position of the bar. Where meters are installed indoors, they shall be located on the first floor or in the basement where they will be readily accessible to authorized company representatives for meter reading, testing, or. For freeway lighting, TxDOT has standard spacings for conventional light poles to provide the minimum AASHTO-recommended illuminance levels. D732 Meter Installation for Self-contained, Poly-phase Meter D732. A guy wire is to be installed one foot down from the top of the pole to the anchor assembly. 4"x6" timbers are not acceptable, even for temporary or construction power poles. (b) Timber property poles are to be suitably treated and have a minimum SWL rating of 5kN (as indicated on the pole disc). AEP West Approved Meter Socket List; Meter main/combinations - manufacturers and specifications. tvec will spot flood stage poles minimum clearance requirements 18' minimum clearance is required over eye bolt furnished by tvec 4x4 4' deep receptacle may be located inside box or breaker with covered receptacle. Requirements for 1 -Ø Underground Service Page 2 of 6 Revised 3/15/19. Expansion coupling installed in fully closed position in the left meter base knockout Maximum of 3 - 24" minimum radius bends - only 1 - 24" minimum radius bend allowed in addition to the bends installed at the transformer, pedestal, pole, and/or meter base Conduit installed minimum 24" deep Service cables. Underground Meter Loop Specifications and Descriptions: Underground Meter Loop Service Diagram. if final grade 4' minimum to 6' maximum verify grounding requirements with your local grover representative, local codes & the nec (article 250). 100 AMP Mobile Home Overhead Meter Pole Installation. Substation Standards Chain-Link Fence General Requirements (Sheet 1 of 2) Transmission Line Standards Steel Pole. Electric Cooperative Pole Must be 20' Long, Treated, & 6"x6" Sq. They cannot be served directly from a secondary riser pole to the meter base. Featuring Infrared Guided Measurement (IGM), the MR160 helps you quickly target moisture issues, visually guiding you to the spot where you can confidently take measurements and analyze readings. JEC Now Offers High Speed Internet. Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube. A Licensee’s Attachments must be installed on the same side of poles (typically the road side) as the existing Attachers. (b) Where it is proposed to locate metering equipment indoors, or within other secure areas, the accessibility arrangements, systems, equipment etc. Ahead of the meter: The Company side of the meter also called the supply or line side Behind the meter: The Customer side of the meter also called demand side or load side 1. An approved self-supporting pole of a material other than wood, if of equivalent strength, may be used. Enter the desired frequency. 5 meters wide. Meter Loop on Building Thru Roof. In some cases this land will also be used for the growing of ornamental plants, and the keeping of hens, rabbits and bees. Permit Requirements Some cities and counties in our service area require that a permit number be issued before new electric service can be established. Do’s and Don’ts for Overhead Service to a Meter Pole. Any inquiries regarding the NEC or local codes should be directed to the local inspection authority. The guide includes DEMCO's office locations with hours of operation, city/parish permit requirements, service entrance specifications, meter pan information, and wiring. Be sure to check with the local power company for that information. Pole should be 6 inches in diameter. NORTH CAROLINA ELECTRICAL CODE, 2011 EDITION Article 10 - ADMINISTRATIVE SECTION 10. Gas Meter Protection – Steel Post Protection: Called Bollards Home » Plumbing » Gas Meters & Valves » Gas Meter Protection – Steel Post Protection: Called Bollards Gas meters that are located in locations where they may be bumped by a car or truck need to be protected. All requirements are based on PUD policies and standards as well as national, state and local electrical codes. NYSEG will specify the size of the meter pole and setting depth based on field conditions. Sub-panel locations(s) Location of all smoke detectors (must be interconnected) Plumbing Details: Show all plumbing fixtures. Safety Clearance for Transformer: Clearance from Outdoor Liquid Insulated Transformers to Buildings (NEC): Liquid Liquid Volume (m3) Fire Resistant Wall Non-Combustible Wall Combustible Wall Vertical Distance Less Flammable NA 0. The system of three-phase alternating current electrical generation and distribution was invented by a nineteenth century creative genius named Nicola Tesla. For this reason the 40 meter section was left a little long so that when the 80 meter section is the correct length, the 40 meter section resonates on the desired frequency. A range of metal fabricated meter enclosures specifically engineered to suit the Service and Installation Rules (SIR) of WA based Electricity Distributors. Long/200 kg psc pole and maintains good business relationship with gujarat electricity board (pgvcl-rajkot). We deliver power, maintain and read meters and construct and maintain. If a consumer has any question concerning the current Service Rules and Regulations, inquiry should be directed to any of the Cooperative's offices. AEP West Approved Meter Socket List; Meter main/combinations - manufacturers and specifications. Mobile Home Revised, added table of acceptable pole classes Oct 2014 VII Approved Meter Enclosures Revised, updated the approved enclosure list Jan 2015 VII Approved Meter Enclosures Revised, corrected the approved enclosure list Apr 2015 III Service Provisions Revised, three phase stacked vaults now allowed Jun 2015 Fig VI-10. Rectangular poles shall have a minimum cross section of 6” x 6” nominal; circular poles shall meet the requirements for permanent service poles specified in Note 7 on Page 2 except that the minimum length may be 20 feet providing the required clearances are maintained. Two constructions are available. 6 MB: The following are change packages for the Goldbook. Safety Requirements for Vessels. standards and conformity assessment system, the American National Standards Institute (ANSI) empowers its members and constituents to strengthen the U. 30 : Customer Requirements for Strand-Mounted Antenna Assemblies on Wood Poles - 0095. Street sweeping operations and old meter technology prevented this type of a program from being implemented in the past. Install metering equipment per Ameren specs, NEC and local codes if subject to inspection. Overhead Service to Temporary Meter Pole Underground Service to Temporary Meter Pole Transfer Switch Options for Standby Generator. with a minimum length of 23 feet and a minimum pole top diameter of 6 inches. Meter shall be relocated to the back of walk in a landscape area within the right-of-way (preferred) or into the sidewalk. Meter Application was received by the appropriate person. Electric Service Guidelines Page 21 Drawing Notes: 1. 1 … All applicants for state or national records must be made on printed forms available from the state association or National Federation office. 00 pole mount removal cut $20. The Simplified 2 meter J-Pole By Michael Martens, KB9VBR Many a new ham’s first antenna has been the 2 meter J-Pole. The pole barn is the most simple of all shed designs. Requirements for 1 -Ø Underground Service Page 2 of 6 Revised 3/15/19. A variety of Powerpole® products can handle 15 amps up to 350 amps and accommodate wires from 20 gauge to 4/0 AWG. Description Reviewed/Checked Approved December 2018 8 Updated meter room requirements,. The information and recommendations in our Meter and Service Guide (PDF) are, in general, sufficient to. (c) Other types of property poles are acceptable that have an RPEQ certificate and.